
Raggovidda Wind Farm is located on the Rakkocearro plateau, about 10 km south of Berlevåg, covering an area of 10 km². The highest point reaches 452 meters above sea level, with rocky terrain, no vegetation, and limited wildlife. Surrounding areas serve as grazing and calving land for reindeer from May to September, with restricted access during calving from mid-May to mid-June.
The project was completed in just 15 months. The 15 wind turbines are now ready to generate enough electricity to power approximately 9,500 households annually.