
The project involved the development of a power station with a horizontal access tunnel, a drainage tunnel for turbine outflow, and an extensive upstream tunnel system. Designed for an intake elevation of 292 meters and a station elevation of 4 meters, the facility achieves a gross head of 288 meters. With a turbine capacity of 7.4 MW and an estimated annual production of 30 GWh, the station plays a key role in regional power generation.